The Unipol Midi building complex, used for tertiary and administrative purposes, is strategically important due to its central location in Bologna's exhibition district.

Strengths

Integrated design

Cefla oversaw the design and construction of the mechanical, electrical, water, air treatment, special and technological systems, ensuring optimal integration with the building's architecture.

Energy efficiency

Implementation of energy-efficient plant solutions, contributing to the environmental sustainability of the complex.

Advanced technologies

Use of innovative systems for plant management and control, ensuring environmental comfort and optimisation of energy consumption.


Keynumbers

130 m

Building height

24

Number of floors

3.000 kW

Installed electrical power

100 kWp

Photovoltaic power

Context

The Unipol Midi project is part of Milan's urban landscape and represents a major development in the office sector. The building complex will house offices and commercial spaces, contributing to the development and redevelopment of the area.

The complexity of this structure and the high degree of automation and computerisation required called for an electrical network capable of ensuring almost total continuity of operation. Particular attention was paid to user comfort, with special care taken in the choice of lighting solutions.


Challenges

    • System integration
      Creating technological systems that integrate harmoniously with the architecture of the complex.
    • Multidisciplinary coordination
      Simultaneously managing different types of systems, ensuring a smooth interface between the various technological components.
    • Completion times
      Adherence to delivery schedules in a complex and structured context.

Intervention

Cefla was responsible for:

  • The design and construction of the mechanical, electrical, water, air treatment, special and technological systems and fire prevention systems for the building complex.
  • The integration of the systems with the architectural structures, ensuring functionality and aesthetics.

Realisation

The project was completed successfully, on schedule and within budget. Unipol Midi is now an example of a modern, sustainable office building with state-of-the-art technological systems that guarantee comfort, safety and energy efficiency.
Cefla was responsible for all the plant engineering – technological control units, mechanical systems, air treatment, water systems, irrigation of green areas, fire prevention, electrical, telephone and data systems, special systems, safety systems, external lighting, ventilation, etc. (see attachment for details of the work) – for Lots 22, 23 and 41. The work also extended to Lots 15-16-17: a laminated wood construction clad in titanium-zinc that houses the restaurant and bar area.
The characteristics of this building stand out from the rest of the complex due to its unique nature. The acoustic, natural and artificial lighting and air conditioning systems were designed with carefully selected materials to solve the complex problems arising from the shape and size of the rooms.
The furnishings of the hall, the kitchen equipment, the wine cellar and the efficient distribution and reception system make this project a benchmark for quality.

 


Case Study

Show all
La Casa di Leonardo
EPC Contracting

La Casa di Leonardo

Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
EPC Contracting

Torre Unipol, EPC Contracting

Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
EPC Contracting

Torre Allianz, EPC Contracting

Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
EPC Contracting

Galleria degli Uffizi

Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
EPC Contracting

Teatro alla Scala

Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
EPC Contracting

Cefla Gest

Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
EPC Contracting

Bassi Business Park

Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
EPC Contracting

FICO Eataly World

Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
EPC Contracting

Poste Italiane

Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...

Find the perfect solution for your business

 

Prefooter background
We create. You live