The main purpose of the renovation was to create a representative office to accommodate the company's top management during their stay in Milan.
Strengths
Turnkey solution
Cefla carried out a complete refurbishment of the technological systems in the historic building, integrating modern solutions in keeping with the architectural context.
Implementation of intelligent control systems
The adoption of advanced technologies for plant management and monitoring has improved operational efficiency and environmental comfort.
Integrated EPC approach
Complete project management, from design to implementation, ensuring consistency and quality at every stage of the process.
Key Numbers
1.200 m²
target area
duration of the works
6
months
Total investment
1,5
million euros
Background
The building, which has seven floors above ground and three basement floors, features spacious executive offices and meeting rooms.
Challenges
- Integration into a historical setting
Implementing advanced technological solutions while being respectful of the architectural and historical characteristics of the building. - Structural limitations
Working in confined and restricted spaces, adapting the plant engineering solutions to the specific characteristics of the existing building. - Tight deadlines
Completing the work within a limited time frame, minimising the impact on the building's activities.
Project Tasks
Cefla has carried out:
- Replacement and upgrading of thermo-mechanical systems, improving energy efficiency and environmental comfort.
- Implementation of a Building Management System (BMS) for centralised control and monitoring of the systems.
- Installation of electrical and special systems, including safety and lighting systems, in compliance with current regulations.
Implementation
Completed in 2019, the project was delivered on schedule and ensured business continuity. Cefla's integrated approach effectively coordinated the various phases of the project, ensuring high standards of quality and performance.
CLIMATE CONTROL
On the roof of the offices, 12 external units of 45 kW and one of 56 kW power the internal units, providing heating and cooling. Two rooftop units treat 20,000 m³/h of outside air. In the lobby, floor panels support the internal units in winter. Via Pantano side (residential units): Floor panels air-condition the residential units, with towel warmers in the bathrooms. They also operate in summer with water at 18°C to prevent condensation and cool the air. A 7,000 m³/h rooftop unit and fan units with heat exchangers manage air exchange and humidity. The water for the panels and towel warmers is produced by a multi-purpose unit and distributed by pumps in an underground plant.
DOMESTIC HOT WATER PRODUCTION
Porta Romana side (Unipol offices): A direct expansion machine produces domestic hot water at 50°C. Via Pantano side (residential units): The multi-purpose unit produces domestic hot water at 50°C.
SMOKE DETECTION SYSTEM
The SIEMENS system, managed by two control units, monitors 500 detectors and 24 air analysis modules.
BMS SYSTEM
Two BMS systems manage the building, one for the offices and the other for the common areas of the residential units.
PHOTOVOLTAIC
Photovoltaic panels on the office roof produce almost 10KW.
FIRE PREVENTION
The access ramp and underground car parks are protected by a sprinkler system, with UNI45 fire extinguishers and hydrants throughout the building.
Download
Gallery
+3
Tutte le foto (9)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business