The Unifimm Tower is one of the first ten buildings in Italy to have obtained the ‘gold’ level of international LEED certification, which assesses the entire construction process from an energy and environmental impact perspective.
Strengths
Turnkey solution
Cefla supplied a turnkey solution, delivering the entire project from the project design to the technological system implementation phases.
High energy efficiency
The systems have been designed to ensure high efficiency, contributing to the building's environmental sustainability.
Integration with existing architecture
The designers' special focus was on system integration with the tower architecture, preserving the space aesthetics and functionality.
Key Numbers
127 m
Building height
33 floors
LEED Gold
Energy certification
Background
Torre Unifimm, also known as Torre Unipol, is 127 metres high and is the tallest building in the Emilia-Romagna region. The tower houses the offices of the Unipol financial group and a museum space. The project involved the redevelopment of a former industrial area, with the construction of a complex that also includes a hotel, a fitness centre, a car park and a shopping centre.
Cefla designed and built all the mechanical, electrical and special electrical systems for the entire area.
Challenges
- Integration with the architecture
Designing technological systems that integrate perfectly with the architecture of the tower, preserving the aesthetics and functionality of the spaces. - High energy efficiency standards
Ensuring plant solutions that meet the highest standards of energy efficiency and environmental sustainability.
- Tight deadlines
Completing the work in a short time, coordinating with other construction site activities.
Project Tasks
Cefla provided a turnkey solution that included:
- Mechanical, electrical and special systems designed to ensure high energy efficiency and environmental comfort.
- Automation and control systems for optimal plant management.
- Innovative solutions for reducing energy consumption and emissions.
Implementation
The project was successfully completed in 2011, on schedule and within budget.
Main features of the office tower:
- Use of clear neutral glass that does not distort colour perception;
- Use of protected and adjustable sunshades in the cavity for total light control;
- Use of construction technology that ensures greater fire safety by horizontally sectioning the various floors;
- Use of renewable energy sources;
- Data network system for each individual office and Wi-Fi and GSM coverage in all areas of the tower building, including the basement floors;
- Building facades illumination obtained with a colour-changing LED system.
Download
Gallery
Tutte le foto (3)
Case Study

Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
News

Cefla and Unica Ingegneria launch Pre-vision: sustainability generates efficiency with a predictive approach
02 September 2025
Through the development of en.vision, it aims to make a difference for companies that want to invest in concrete energy efficiency, optimization, decarbonization, cybersecurity, and resource preservation projects.

58 week-long works, no inconvenience - the Astalli Substation project in downtown Rome
02 September 2025
Cefla Engineering enhances fire safety at the historic Astalli Substation in Rome, ensuring uninterrupted electricity supply during extensive year-long renovations.

Networked Services Tour 2025: Networks in security, projects that look to the future
01 September 2025
Learn how Cefla transforms historic infrastructure into sustainable energy networks and the use of AI for predictive water maintenance at the Networked Services Tour 2025.
Find the perfect solution for your business