UNIFIMM Tower

EPC Contracting for UNIFIMM Tower
Customer Unipol
Where Bologna
Solution EPC Contracting
Sector Executive

The Unifimm Tower is one of the first ten buildings in Italy to have obtained the ‘gold’ level of international LEED certification, which assesses the entire construction process from an energy and environmental impact perspective.

Strengths

Turnkey solution

Cefla supplied a turnkey solution, delivering the entire project from the project design to the technological system implementation phases.

High energy efficiency

The systems have been designed to ensure high efficiency, contributing to the building's environmental sustainability.

Integration with existing architecture

The designers' special focus was on system integration with the tower architecture, preserving the space aesthetics and functionality.


Key Numbers

127 m

Building height

33 floors

LEED Gold

Energy certification

Background

Torre Unifimm, also known as Torre Unipol, is 127 metres high and is the tallest building in the Emilia-Romagna region. The tower houses the offices of the Unipol financial group and a museum space. The project involved the redevelopment of a former industrial area, with the construction of a complex that also includes a hotel, a fitness centre, a car park and a shopping centre.

Cefla designed and built all the mechanical, electrical and special electrical systems for the entire area.


Challenges

  • Integration with the architecture
    Designing technological systems that integrate perfectly with the architecture of the tower, preserving the aesthetics and functionality of the spaces.
  • High energy efficiency standards
    Ensuring plant solutions that meet the highest standards of energy efficiency and environmental sustainability.
  • Tight deadlines
    Completing the work in a short time, coordinating with other construction site activities.

Project Tasks

Cefla provided a turnkey solution that included:

  • Mechanical, electrical and special systems designed to ensure high energy efficiency and environmental comfort.
  • Automation and control systems for optimal plant management.
  • Innovative solutions for reducing energy consumption and emissions.

Implementation

The project was successfully completed in 2011, on schedule and within budget.

Main features of the office tower:

  • Use of clear neutral glass that does not distort colour perception;
  • Use of protected and adjustable sunshades in the cavity for total light control;
  • Use of construction technology that ensures greater fire safety by horizontally sectioning the various floors;
  • Use of renewable energy sources;
  • Data network system for each individual office and Wi-Fi and GSM coverage in all areas of the tower building, including the basement floors;
  • Building facades illumination obtained with a colour-changing LED system.


Case Study

Show all
La Casa di Leonardo
EPC Contracting

La Casa di Leonardo

Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
EPC Contracting

Torre Unipol, EPC Contracting

Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
EPC Contracting

Torre Allianz, EPC Contracting

Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
EPC Contracting

Galleria degli Uffizi

Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
EPC Contracting

Teatro alla Scala

Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
EPC Contracting

Cefla Gest

Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
EPC Contracting

Bassi Business Park

Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
EPC Contracting

FICO Eataly World

Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
EPC Contracting

Poste Italiane

Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...

Find the perfect solution for your business

Prefooter background
We create. You live