FICO Eataly World
EPC Contracting for FICO Eataly World
FICO Eataly World, which opened its doors in Bologna in 2017, is the world's largest theme park dedicated to Italian food and agriculture, its biodiversity, food culture and sustainability, and is considered the cultural heir to Expo Milano 2015.
Strengths
Turnkey solution
Cefla provided a complete solution, taking care of all stages of the project, from design to the installation of the technological systems.
High energy efficiency
The systems have been designed to ensure high efficiency, contributing to the environmental sustainability of the park.
Integration with existing architecture
Particular attention was paid to integrating the systems with the architecture of the complex, preserving the aesthetics and functionality of the spaces.
Key Numbers
About
10 hectares
Total surface area
6.000 kWe
Electrical power of the systems
6.000 kWt
Thermal power of the systems
Background
FICO Eataly World was a theme park dedicated to the agri-food sector and gastronomy, located in the Bologna Agri-Food Centre. Opened on 15 November 2017, the park covered an area of approximately 100,000 m² and included shops, restaurants, educational areas and outdoor spaces dedicated to agricultural activities.
The project implied a significant challenge in terms of the design and construction of the technological systems, given the complexity and variety of available functions within the park.
Challenges
- Integration with the existing architecture
Designing technological systems that integrate perfectly with the architecture of the complex, preserving the aesthetics and functionality of the spaces. - High energy efficiency standards
Ensuring plant solutions that meet the highest standards of energy efficiency and environmental sustainability. - Tight deadlines
Completing the work in a short time, coordinating with other construction site activities.
Project Tasks
Cefla oversaw the design and construction of the technological systems for FICO Eataly World, providing a turnkey solution that included:
- Mechanical air conditioning, plumbing and industrial water systems.
- Electrical systems for power and lighting.
- Special systems, including security, fire prevention and building automation systems.
Implementation
The project was successfully completed in 2017, on schedule and within budget. The systems installed by Cefla have helped to ensure high standards of energy efficiency and environmental sustainability for FICO Eataly World.
In terms of electrical systems, it is worth noting the exclusive use of LED lighting and, above all, the production of electricity from the photovoltaic system (the largest on a roof in Europe), originally serving the operators now transferred to the NAM (Nuova Area Mercatale) and equipped with around forty delivery points (minimum 100 kW).
The rooms equipped with hoods have been fitted with systems for air extraction and recirculation or for air extraction only. The first type is used not only in closed laboratories but also in some shops and restaurants opening out to the mall. In addition to the hoods, there is an air extraction and replenishment system consisting of an extraction box with an inverter and a filtered and treated air replenishment unit. The air intake rate is equal to 80% of the extraction rate, so that the preparation rooms are at a lower pressure than the surrounding rooms. The air distribution and diffusion ducts are made of galvanised sheet metal. Replenishment is via adjustable finned supply grilles located near the hood. The air extraction systems are dedicated to the bars and small restaurants located in the mall and have modest extraction flow rates, counterbalanced by exhaust boxes with inverters.
Cefla has also been entrusted with the maintenance of the structure, which is carried out by qualified personnel on site using sophisticated real-time monitoring technologies.
Download
Gallery
Tutte le foto (6)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business