Cefla built the Termini underground station, the main hub of Rome's underground network and the only interchange station at the intersection of lines A and B.
Strengths
Architectural integration
Cefla designed and built technological systems that are perfectly integrated with the architectural design of the shopping centre, ensuring functionality and aesthetics.
Turnkey solution
Complete project management, from design to implementation, ensuring efficient coordination and on-time delivery.
Energy efficiency
Implementation of advanced plant systems to ensure environmental comfort and optimise energy consumption.
Key Numbers
1.800 kW
Installed thermal power
1.900 kW
Installed cooling capacity for common areas and commercial units
about
3700
Lighting fixtures
Background
The Le Cotoniere Shopping Centre is an important commercial facility in Salerno, characterised by its distinctive architectural design. The project required advanced engineering solutions to ensure comfort, safety and environmental sustainability.
Le Cotoniere is an example of how an old industrial building can be restored showing respect for its history and the environment and become the heart of an innovative structure serving a city and its surrounding area.
Challenges
- System integration
Creating technological systems that integrate harmoniously with the architecture of the shopping centre. - Multidisciplinary coordination
Simultaneously managing different types of systems, ensuring a smooth interface between the various technological components. - Completion times
Compliance with delivery schedules in a complex and multifaceted setting.
Project Tasks
Cefla carried out:
- The design and construction of air conditioning, plumbing, electrical and lighting systems.
- The installation of special systems, including fire prevention, intrusion detection, video surveillance and Building Management System (BMS).
- The integration of the systems with the architectural structures, ensuring functionality and aesthetics.
Implementation
Cefla installed all the systems, completing the work in just eight months: air conditioning, plumbing and sanitation, electrical and lighting, anti-intrusion, closed-circuit TV, fire detection, sound diffusion, electrical and mechanical system supervision systems, such as light management, thermoregulation and heat pump operation (no combustion boilers were installed) and control of the main cabin equipment. The focus was on energy saving, mainly using LED lighting technology.
This was an important project due to the size of the site and the precise structural and landscape constraints to be complied with by the designer and construction manager.
The sprinkler system, i.e. the automatic fire extinguishing system, is in complete harmony with the shape and dominant colour of the roof. We followed its characteristic undulating lines using specially calendered and painted pipes in the workshop.
In this way, the system has been integrated into the architectural design, enhancing it. With the same aim in mind, the lighting fixtures were chosen, in agreement with the project manager, so that their inevitable presence would be as discreet as possible, ensuring that the light did not come from intrusive furnishings.
The shopping centre serves a catchment area of 820,000 people living within a 30-minute drive and has almost 3,000 car parking spaces. The structure houses 94 commercial units of various sizes and a 3,700 m² Conad Superstore. In total, the shopping centre has a surface area of 35,000 m², while the car parks cover approximately 49,000 m². The green area, also served by Cefla facilities, is particularly charming and spacious, with two fountains and a row of palm trees enhanced by accent lighting that highlights the plants and outlines the evening walkway.
Download
Gallery
Tutte le foto (4)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business