Rome Underground

EPC Contracting for Rome Metro
Customer Rome Metro
Where Rome
Solution EPC Contracting
Sector Transport

Cefla built the Termini underground station, the main hub of Rome's underground network and the only interchange station at the intersection of lines A and B.

Strengths

Integrated EPC approach

Cefla managed the design, construction and testing of the technological systems at the Termini hub, providing a turnkey service for a complex and strategic infrastructure.

Improvement of operational performance

The completed task enhanced the operational services and performance of the node, improving the efficiency and safety of the entire underground hub.

Complete redevelopment

The project included the complete renovation of the Termini hub, with a particular focus on modernising the facilities and removing architectural barriers.


Key Numbers

30.000 m2

Total area of intervention

abt. 6.000

Checked points

279

Video surveillance cameras

Background

The Termini hub is the main junction of the Rome subway system, an interchange point between lines A and B, and represents a crucial piece of infrastructure for urban mobility in the capital. Cefla's intervention is part of a wider project to modernise and upgrade the hub, aimed at improving accessibility, safety and efficiency of the service.

The hub is spread over four separate underground levels and handles around 200,000 passengers per day. For this reason, the internal structures have deteriorated significantly over the years.


Challenges

  • Coordination in an operational environment
    Carry out work without interrupting the underground service, ensuring safety and minimal disruption for passengers.
  • Technological integration
    Implement advanced plant systems in an existing structure, ensuring compatibility and optimal performance.
  • Accessibility and safety
    Eliminate architectural barriers and improve evacuation conditions in case of emergency.

Project Tasks

Cefla carried out:

  • Mechanical systems: water, fire prevention, ventilation.
  • Upgrading of the underground hub, improving efficiency and safety.
  • Complete renovation of the Termini hub, including modernisation of the systems and removal of architectural barriers.

Implementation

The project was completed on time and within budget, ensuring the delivery of a modernised infrastructure that meets the required safety and efficiency standards. Termini station is now an example of urban regeneration, symbolising the evolution and improvement of mobility in the capital.
Cefla carried out the general renovation, with special focus on safety aspects and the following systems: Intrusion detection, Fire-fighting water systems, Drainage, Emergency lighting, Translation, Sound diffusion, Telephone and emergency systems in tunnels (existing only on line “A”), Passenger assistance, CCTV, Turnstiles, Clocks, Power supply, Lighting.

 


Case Study

Show all
La Casa di Leonardo
EPC Contracting

La Casa di Leonardo

Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
EPC Contracting

Torre Unipol, EPC Contracting

Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
EPC Contracting

Torre Allianz, EPC Contracting

Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
EPC Contracting

Galleria degli Uffizi

Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
EPC Contracting

Teatro alla Scala

Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
EPC Contracting

Cefla Gest

Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
EPC Contracting

Bassi Business Park

Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
EPC Contracting

FICO Eataly World

Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
EPC Contracting

Poste Italiane

Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...

Find the perfect solution for your business

 

Prefooter background
We create. You live