M9 Museum of the Twentieth Century
EPC Contracting for M9 Museum of the Twentieth Century
Promoted by Fondazione di Venezia and inaugurated in December 2018, the Museo del Novecento in Mestre is a new pole of attraction towards the city centre.
Strengths
Advanced energy efficiency
The M9 complex is an example of an NZEB (Nearly Zero Energy Building), thanks to its high-performance systems and engineering solutions.
Innovative technology
Cefla has implemented trigeneration systems, geothermal heat pumps and photovoltaic systems, ensuring a combined and intelligent use of energy sources.
Architectural integration
The facilities have been perfectly integrated into the historical and urban texture of downtown Mestre, preserving the aesthetics and value of the site.
Key Numbers
over 9.000 m²
Total area served
200 kWe
Installed trigeneration power
350 m²
Surface area of photovoltaic panels
About
500 tonnes/year
CO₂ emissions avoided
Background
The M9 Museum, located in Mestre (Venice), is an innovative museum and cultural centre dedicated to the Italian 20th century. The project is part of an urban regeneration programme on former brownfield sites, with a particular focus on the dialogue between contemporary architecture and the historical background.
A project characterised by a remarkable level of integration between architectural, structural and plant engineering aspects and innovative technologies for Italy.
Challenges
- NZEB building in a historic setting
Creating a nearly zero-energy complex within an established urban centre required highly innovative solutions that were compatible with architectural and landscape constraints. - Multi-source integration
Coordinating different energy technologies (trigeneration, geothermal, photovoltaic) into a single harmonised and efficient system - Precision engineering
High standards of comfort and microclimate control to ensure the preservation of museum exhibits and the wellbeing of visitors.
Project Tasks
Cefla was responsible for:
- The design and construction of the air conditioning, electrical, plumbing and special systems.
- The installation of the trigeneration system, consisting of a gas-fired internal combustion engine with heat recovery for heating and cooling.
- The implementation of geothermal heat pumps and photovoltaic panels, with intelligent integration via a BMS (Building Management System).
Implementation
Works carried out between 2016 and 2018 enabled the museum to open as Italy's first NZEB museum complex, meeting all deadlines, quality standards and energy targets. The M9 stands out for its low-enthalpy geothermal field, consisting of 60 probes 110 m deep with polyethylene pipes and glycol-free water, ensuring the sustainability of the system. The multi-purpose heat pumps, with exchange capacities of 356 kW (heating) and 211 kW (cooling), make the system highly efficient (COP 4.19, EER 4.68), integrating scroll compressors (R410a) and a screw heat pump (R134a) for higher thermal requirements.
All systems are designed to maximise efficiency, both in air conditioning and DHW production, avoiding the use of methane gas generators in favour of eco-efficient solutions. DHW for the toilets comes from the heating and cooling plant, while that for the kitchen is stored and heated by heat pumps and an electric booster.
Each area of the museum has calibrated plant solutions: the ground floor has radiant panels and fan coils, the basement and educational areas have all-air systems and localised fan coils, and the upper floors are air-conditioned using thermal slab systems, which use the thermal inertia of the structures for maximum energy efficiency and comfort. This differentiated approach and use of advanced systems result in an eco-efficient and innovative footprint of the entire project.
Download
Gallery
Tutte le foto (3)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business