M9 Museum of the Twentieth Century

EPC Contracting for M9 Museum of the Twentieth Century
Customer M9
Where Mestre (VE)
Solution EPC Contracting
Sector Civil

Promoted by Fondazione di Venezia and inaugurated in December 2018, the Museo del Novecento in Mestre is a new pole of attraction towards the city centre.

Strengths

Advanced energy efficiency

The M9 complex is an example of an NZEB (Nearly Zero Energy Building), thanks to its high-performance systems and engineering solutions.

Innovative technology

Cefla has implemented trigeneration systems, geothermal heat pumps and photovoltaic systems, ensuring a combined and intelligent use of energy sources.


Architectural integration

The facilities have been perfectly integrated into the historical and urban texture of downtown Mestre, preserving the aesthetics and value of the site.


Key Numbers

over 9.000 m²

Total area served

200 kWe

Installed trigeneration power

350 m²

Surface area of photovoltaic panels
About

500 tonnes/year

CO₂ emissions avoided

Background

The M9 Museum, located in Mestre (Venice), is an innovative museum and cultural centre dedicated to the Italian 20th century. The project is part of an urban regeneration programme on former brownfield sites, with a particular focus on the dialogue between contemporary architecture and the historical background.

A project characterised by a remarkable level of integration between architectural, structural and plant engineering aspects and innovative technologies for Italy.


Challenges

  • NZEB building in a historic setting
    Creating a nearly zero-energy complex within an established urban centre required highly innovative solutions that were compatible with architectural and landscape constraints.
  • Multi-source integration
    Coordinating different energy technologies (trigeneration, geothermal, photovoltaic) into a single harmonised and efficient system
  • Precision engineering
    High standards of comfort and microclimate control to ensure the preservation of museum exhibits and the wellbeing of visitors.

Project Tasks

Cefla was responsible for:

  • The design and construction of the air conditioning, electrical, plumbing and special systems.
  • The installation of the trigeneration system, consisting of a gas-fired internal combustion engine with heat recovery for heating and cooling.
  • The implementation of geothermal heat pumps and photovoltaic panels, with intelligent integration via a BMS (Building Management System).

Implementation

Works carried out between 2016 and 2018 enabled the museum to open as Italy's first NZEB museum complex, meeting all deadlines, quality standards and energy targets. The M9 stands out for its low-enthalpy geothermal field, consisting of 60 probes 110 m deep with polyethylene pipes and glycol-free water, ensuring the sustainability of the system. The multi-purpose heat pumps, with exchange capacities of 356 kW (heating) and 211 kW (cooling), make the system highly efficient (COP 4.19, EER 4.68), integrating scroll compressors (R410a) and a screw heat pump (R134a) for higher thermal requirements.
All systems are designed to maximise efficiency, both in air conditioning and DHW production, avoiding the use of methane gas generators in favour of eco-efficient solutions. DHW for the toilets comes from the heating and cooling plant, while that for the kitchen is stored and heated by heat pumps and an electric booster.
Each area of the museum has calibrated plant solutions: the ground floor has radiant panels and fan coils, the basement and educational areas have all-air systems and localised fan coils, and the upper floors are air-conditioned using thermal slab systems, which use the thermal inertia of the structures for maximum energy efficiency and comfort. This differentiated approach and use of advanced systems result in an eco-efficient and innovative footprint of the entire project.



Case Study

Show all
La Casa di Leonardo
EPC Contracting

La Casa di Leonardo

Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
EPC Contracting

Torre Unipol, EPC Contracting

Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
EPC Contracting

Torre Allianz, EPC Contracting

Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
EPC Contracting

Galleria degli Uffizi

Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
EPC Contracting

Teatro alla Scala

Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
EPC Contracting

Cefla Gest

Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
EPC Contracting

Bassi Business Park

Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
EPC Contracting

FICO Eataly World

Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
EPC Contracting

Poste Italiane

Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...

Find the perfect solution for your business

 

Prefooter background
We create. You live