Unipol Midi

EPC Contracting for Unipol Midi
Customer Unipol
Where Bologna
Solution EPC Contracting
Sector Executive

The Unipol Midi building complex, used for tertiary and administrative purposes, is strategically important due to its central location in Bologna's exhibition district.

Strengths

Integrated design

Cefla oversaw the design and construction of the mechanical, electrical, water, air treatment, special and technological systems, ensuring seamless integration with the building's architecture.

Energy efficiency

Implementation of energy-efficient plant solutions, contributing to the environmental sustainability of the complex.

Advanced technologies

Use of innovative systems for plant management and control, ensuring environmental comfort and optimisation of energy consumption.


Key Numbers

130 m

Building height

24

Number of floors

3.000 kW

Installed electrical power

100 kWp

Photovoltaic power

Background

The Unipol Midi project is part of Milan's urban landscape and a major landmark in the office building sector. The building complex will house offices and commercial spaces, contributing to the development and redevelopment of the area.

The complexity of this structure and the high degree of automation and computerisation required called for an electrical network capable of ensuring almost total continuity of operation. Particular attention was paid to user comfort, with special care taken in the choice of lighting solutions.


Challenges

    • System integration
      Creating technological systems that integrate harmoniously with the architecture of the complex.
    • Multidisciplinary coordination
      Simultaneously managing different types of systems, ensuring a smooth interface between the various technological components.
    • Completion times
      Adherence to delivery schedules in a complex and structured setting.

Project Tasks

Cefla was responsible for:

  • The design and construction of the mechanical, electrical, water, air treatment, special and technological systems and fire prevention systems for the building complex.
  • The integration of the systems with the existing architectural structures, ensuring functionality and aesthetics.

Implementation

The project was completed successfully, on schedule and within budget. Unipol Midi is now an example of a modern, sustainable office building with state-of-the-art technological systems that guarantee comfort, safety and energy efficiency.
Cefla was responsible for all the plant engineering – technological control units, mechanical systems, air treatment, water systems, irrigation of green areas, fire prevention, electrical, telephone and data systems, special systems, safety systems, external lighting, ventilation, etc. (see attachment for details of the work) – for Lots 22, 23 and 41. The work also extended to Lots 15-16-17: a laminated wood construction clad in titanium-zinc that houses the restaurant and bar area.
The characteristics of this building make it stand out from the rest of the complex due to its unique nature. The acoustic, natural and artificial lighting and air conditioning systems were designed with carefully selected materials to solve the complex problems arising from the shape and size of the rooms.
The furnishings of the hall, the kitchen equipment, the wine cellar and the efficient distribution and reception system make this project a benchmark for quality.

 


Case Study

Show all
Sea Linate Malpensa
EPC Contracting

Sea Linate Malpensa

CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
EPC Contracting

M9 Museum of the Twentieth Century

The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
EPC Contracting

Cà Litta

Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
EPC Contracting

City of Cultures

Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
EPC Contracting

Rome Metro

Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
EPC Contracting

Unipol Midi

Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
EPC Contracting

TeaPak

Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
EPC Contracting

Crif CED

Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
EPC Contracting

Le Cotoniere

Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
EPC Contracting

FICO Eataly World

Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...

Find the perfect solution for your business

 

Prefooter background
We create. You live