Cefla built the Termini underground station, the main hub of Rome's underground network and the only interchange station at the intersection of lines A and B.
Strengths
Integrated EPC approach
Cefla managed the design, construction and testing of the technological systems at the Termini hub, providing a turnkey service for a complex and strategic infrastructure.
Improvement of operational performance
The completed task enhanced the operational services and performance of the node, improving the efficiency and safety of the entire underground hub.
Complete redevelopment
The project included the complete renovation of the Termini hub, with a particular focus on modernising the facilities and removing architectural barriers.
Key Numbers
30.000 m2
Total area of intervention
abt. 6.000
Checked points
279
Video surveillance cameras
Background
The Termini hub is the main junction of the Rome subway system, an interchange point between lines A and B, and represents a crucial piece of infrastructure for urban mobility in the capital. Cefla's intervention is part of a wider project to modernise and upgrade the hub, aimed at improving accessibility, safety and efficiency of the service.
The hub is spread over four separate underground levels and handles around 200,000 passengers per day. For this reason, the internal structures have deteriorated significantly over the years.
Challenges
- Coordination in an operational environment
Carry out work without interrupting the underground service, ensuring safety and minimal disruption for passengers.
- Technological integration
Implement advanced plant systems in an existing structure, ensuring compatibility and optimal performance.
- Accessibility and safety
Eliminate architectural barriers and improve evacuation conditions in case of emergency.
Project Tasks
Cefla carried out:
- Mechanical systems: water, fire prevention, ventilation.
- Upgrading of the underground hub, improving efficiency and safety.
- Complete renovation of the Termini hub, including modernisation of the systems and removal of architectural barriers.
Implementation
The project was completed on time and within budget, ensuring the delivery of a modernised infrastructure that meets the required safety and efficiency standards. Termini station is now an example of urban regeneration, symbolising the evolution and improvement of mobility in the capital.
Cefla carried out the general renovation, with special focus on safety aspects and the following systems: Intrusion detection, Fire-fighting water systems, Drainage, Emergency lighting, Translation, Sound diffusion, Telephone and emergency systems in tunnels (existing only on line “A”), Passenger assistance, CCTV, Turnstiles, Clocks, Power supply, Lighting.
Download
Tutte le foto (0)
Case Study
EPC Contracting
Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...
EPC Contracting
M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...
EPC Contracting
Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...
EPC Contracting
City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...
EPC Contracting
Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...
EPC Contracting
Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...
EPC Contracting
TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...
EPC Contracting
Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...
EPC Contracting
Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...
EPC Contracting
FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
News
FM DAY 2025. New worlds under construction.
17 November 2025
Cefla is participating in FM Day 2025 to discover innovative technologies and discuss the future of space and service management.
Innovation Days 2025 Emilia-Romagna
13 November 2025
Barbara Pennacchi, Sales Specialist Power Generation, from the Engineering Business Unit, gave a speech at the Innovation Days of Il Sole 24 Ore.
Cefla at Ecomondo showcases technology that turns vibration into audio
12 November 2025
Cefla presents an innovative technology at Ecomondo that turns pipe vibrations into audio signals to detect and prevent water leaks.
Find the perfect solution for your business