This type of intervention was carried out with a view to making more functional choices in maintaining the intended use of the property.
Strengths
Integrated EPC approach
Cefla managed the entire plant engineering process, offering a turnkey service that covered design, construction and testing.
Certified sustainability
The project has obtained LEED® Gold certification thanks to the adoption of advanced technological solutions and the optimisation of energy consumption.
Technological innovation
Implementation of Building Management Systems (BMS) for the control and efficient management of systems, ensuring comfort and high performance.
Key Numbers
over
10.000 m
Total surface area
up to
25%
Estimated energy savings (compared to similar non-certified buildings)
5.928
Building management systems points
Background
Prometeia, a leading financial consulting and data analysis company, decided to centralise its Bologna offices into a single modern and sustainable building. The new headquarters are a benchmark for innovation and efficiency in the advanced tertiary sector.
Cefla has adapted its Global Service, creating a turnkey solution for managing the entire facility: this led to a partnership that has now been successful for six years.
Challenges
- Integration of complex systems Coordinate the installation of mechanical, electrical and special systems in a multifunctional building, ensuring maximum operational efficiency.
- Completion times Adhere to a tight schedule to allow the company to start operating on time.
- Sustainability objectives Achieve high energy and environmental standards to obtain LEED® Gold certification.
Project Tasks
Cefla Engineering was responsible for:
- The design and construction of HVAC, electrical, plumbing and special systems.
- The implementation of a BMS system for monitoring and managing the systems.
- The adoption of technological solutions aimed at energy saving and environmental comfort.
Implementation
The project, completed in 2020 on schedule and to the expected standards, has transformed Prometeia's headquarters in Bologna into an example of a modern, efficient and sustainable office building. The project, based on functional criteria and maintaining the building's intended use, involved preserving the underlying structure, renovating the facades, upgrading the systems and fire prevention equipment, replacing the finishes and carrying out structural restoration work.
The north façade, entirely glazed with advanced materials and technologies to maximise energy performance and aesthetics, overlooks the main open-plan spaces with workstations and several meeting rooms. The south façade houses the vertical distribution blocks, technical rooms and toilets, with preserved original light stoneware cladding and ribbon windows. A new raised floor has been laid on all floors above ground level, with carpet and wood finishes; on the ground floor, there is stoneware and wood slats in the meeting room, as well as new mineral fibre and plasterboard false ceilings.
The functional layout remains unchanged: the basement floors house parking spaces, technical rooms, archives, storage rooms and warehouses; the ground floor has a hall, a refreshment area, offices, meeting rooms and an access ramp. From the first to the fifth floor, the spaces are mainly open plan, interspersed with closed offices and meeting rooms with glass walls. The service blocks are located on the south side, together with the technical rooms and service areas for work activities.
Download
Gallery
Tutte le foto (4)
Case Study

Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
Notizie

Cefla and Unica Ingegneria launch Pre-vision: sustainability generates efficiency with a predictive approach
02 September 2025
Through the development of en.vision, it aims to make a difference for companies that want to invest in concrete energy efficiency, optimization, decarbonization, cybersecurity, and resource preservation projects.

58 week-long works, no inconvenience - the Astalli Substation project in downtown Rome
02 September 2025
Cefla Engineering enhances fire safety at the historic Astalli Substation in Rome, ensuring uninterrupted electricity supply during extensive year-long renovations.

Networked Services Tour 2025: Networks in security, projects that look to the future
01 September 2025
Learn how Cefla transforms historic infrastructure into sustainable energy networks and the use of AI for predictive water maintenance at the Networked Services Tour 2025.
Find the perfect solution for your business