Poste Italiane
Construction of the Poste Italiane data centre at its headquarters
Poste Italiane's new data centre has been designed to meet Level IV TIER certification, according to the UpTime Institute.
Strength
Use of rotary UPS with integrated diesel:
Uninterruptible power supplies used in strategic areas because they ensure absolute continuity of operation of all devices in the event of even very brief interruptions in the power supply.
Key Numbers
6.000 kvar
Installed electrical power
3.200 kW
Installed cooling capacity
5.500 sqm
Area of intervention
Background
The complexity of the project, in addition to the size of the systems, was mainly due to the type of building, which dates back to the 1970s. Among other things, it was also necessary to adapt some areas of the building that were previously used as a garage and for other purposes.
The Data Centre was built with the aim of consolidating all of Poste Italiane's data processing centres scattered across various locations throughout the country.
Challenges
Project Tasks
Implementation
Complete construction of the new centralised data centre for Poste Italiane:
- diesel fuel tanks and generator sets with associated smoke extraction systems were installed on the third basement level.
- Data centre and electrical room area with new internal layout; system chimney up to the 13th floor;
- new cooling plant on the second basement level, with dry coolers located on the 13th floor.
Download
Gallery
Tutte le foto (4)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business