Allianz Tower
EPC Contracting for Allianz Tower
Cefla was responsible for the construction of the mechanical systems serving an office building, slab floor and underground car park, developed on the basis of a general sustainability strategy.
Strengths
Integral role in the project
Cefla acted as the EPC Contractor for all the technological systems in the skyscraper, providing a high-performance turnkey service.
High energy efficiency
The plant engineering solutions implemented have been designed to optimise efficiency and contribute to the tower's LEED Platinum certification.
Reliability and operational continuity
The systems have been designed to ensure maximum reliability over the long term, supporting a complex building with high occupancy density.
Key Numbers
205 m
Building height
50
Number of floors
beyond
50.000 m²
managed floor space
LEED Platinum
Environmental certification
Background
The Allianz Tower, located in Milan's CityLife district, is one of the most ambitious architectural and engineering projects completed in Italy in the last decade. It houses the Italian headquarters of Allianz S.p.A. and is considered a symbol of innovation and environmental sustainability.
Cefla's integrated approach ensured perfect coordination between design, material supply, installation and commissioning. The tower is now a model of energy efficiency and technological innovation.
Challenges
- Vertical installations
The tower's unique height required a detailed study of the plant engineering solutions, with particular attention to the vertical distribution of all systems. - Optimisation of technical spaces
Maximum efficiency was also achieved in the design of the spaces allocated to the systems, so as not to interfere with the use of office space. - High quality standards
All systems had to meet stringent requirements for LEED certification and environmental comfort.
Project Tasks
Cefla designed and built:
- Air conditioning and ventilation systems (HVAC)
- Plumbing and sanitary systems
- Electrical and special systems
- Automation and control systems
It also managed commissioning and functional testing, ensuring compliance with contractual deadlines and performance.
Realisation
The mechanical systems of the tower include:
- air conditioning systems
- plumbing systems
- fire prevention systems
- automatic mechanical system control.
The building complex is equipped with a number of “private” communal services, located and distributed within the slab floor area. The following mechanical systems were installed here:
- air conditioning and forced ventilation systems for the garages
- plumbing and drainage systems
- fire-fighting systems
- automatic control of mechanical systems.
The parking area is equipped with a natural ventilation system and a mechanical extraction system, supplemented by a ventilation system, which ensure effective air exchange. Two separate collection networks have been built in the Piastra area:
- Sewage network (toilets)
- Rainwater drainage network (rainwater and rain areas)
Download
Gallery
Tutte le foto (3)
Case Study

Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
Notizie

Cefla and Unica Ingegneria launch Pre-vision: sustainability generates efficiency with a predictive approach
02 September 2025
Through the development of en.vision, it aims to make a difference for companies that want to invest in concrete energy efficiency, optimization, decarbonization, cybersecurity, and resource preservation projects.

58 week-long works, no inconvenience - the Astalli Substation project in downtown Rome
02 September 2025
Cefla Engineering enhances fire safety at the historic Astalli Substation in Rome, ensuring uninterrupted electricity supply during extensive year-long renovations.

Networked Services Tour 2025: Networks in security, projects that look to the future
01 September 2025
Learn how Cefla transforms historic infrastructure into sustainable energy networks and the use of AI for predictive water maintenance at the Networked Services Tour 2025.
Find the perfect solution for your business