An innovative building design that incorporates the latest technology in terms of systems and building automation.
Strengths
Turnkey solution
Cefla provided a complete solution, taking care of all stages of the project, from design to the installation of the technological systems.
High energy efficiency
The systems have been designed to ensure high efficiency, contributing to the environmental sustainability of the buildings.
Integration with architecture
Particular attention has been paid to integrating the systems with the architecture of the buildings, preserving the aesthetics and functionality of the spaces.
Key Numbers
438 kW
Installed thermal power
643 kW
Installed cooling capacity
11.000 m3/h
Air flow rate
2.400 m2
Target Area
Background
COIMA is an Italian company active in the management and development of real estate assets. As part of the redevelopment project for the Porta Nuova area in Milan, COIMA has appointed Cefla to build technological systems for office buildings, with the aim of ensuring high standards of energy efficiency and environmental sustainability.
As with all systems installed in structures of considerable height, the systems were distributed from the bottom upwards and, as there was not enough space available inside the vertical shafts, Cefla opted for a solution featuring sub-central units located on each level of the tower.
Challenges
- Integration with existing architecture
Designing technological systems that integrate seamlessly with the architecture of buildings, preserving the aesthetics and functionality of spaces. - High energy efficiency standards
Ensuring plant engineering solutions that meet the highest standards of energy efficiency and environmental sustainability. - Tight deadlines
Completing work in a short time frame, coordinating with other construction site activities.
Project Tasks
Cefla oversaw the design and construction of:
- Mechanical, electrical and special systems designed to ensure high energy efficiency and environmental comfort.
- Automation and control systems for optimal plant management.
- Innovative solutions for reducing energy consumption and emissions.
Implementation
The project was completed successfully, on time and within budget.
Cefla's systems guarantee high energy efficiency and sustainability. The building offers excellent performance, with an output of approximately 6 kW for every kW consumed.
In addition to photovoltaics and an automatic shading system, the heat pump air conditioning system uses groundwater at 15°C to cool in summer and heat in winter, without noisy machines.
The water is drawn from wells and distributed through a 1.5 km underground ring, upgraded with polypropylene pipes. The system achieves an efficiency of over 85% compared to natural gas, thanks to the recovery of cogenerated thermal energy, classifying it as High Efficiency Cogeneration.
Cefla's turnkey supply includes thermal connections for heating and cooling plants. Lighting is provided by high-quality light fixtures and chandeliers, with LED installations in the square in front of the building.
Download
Gallery
+4
Tutte le foto (10)
Case Study

Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
Notizie

Cefla and Unica Ingegneria launch Pre-vision: sustainability generates efficiency with a predictive approach
02 September 2025
Through the development of en.vision, it aims to make a difference for companies that want to invest in concrete energy efficiency, optimization, decarbonization, cybersecurity, and resource preservation projects.

58 week-long works, no inconvenience - the Astalli Substation project in downtown Rome
02 September 2025
Cefla Engineering enhances fire safety at the historic Astalli Substation in Rome, ensuring uninterrupted electricity supply during extensive year-long renovations.

Networked Services Tour 2025: Networks in security, projects that look to the future
01 September 2025
Learn how Cefla transforms historic infrastructure into sustainable energy networks and the use of AI for predictive water maintenance at the Networked Services Tour 2025.
Find the perfect solution for your business