The complex, which had been abandoned for almost eight years, now houses the new headquarters of Unipol Assicurazioni.

Strengths

Architectural and plant integration

Cefla ha progettato e realizzato impianti tecnologici avanzati perfettamente integrati con l'architettura distintiva dell'edificio, garantendo funzionalità ed estetica.

Energy efficiency and sustainability

Implementation of high energy efficiency plant systems, contributing to the achievement of energy class A1.

Innovative technologies

Use of advanced systems such as geothermal heat pumps and photovoltaic systems for the production of renewable energy. 


Keynumbers

SLP

37.500 mq

2000 mq

Floor area (main building)

13

floors above ground level

Context

Located in Milan's Porta Nuova district, De Castillia 23 is an iconic building owned by the Unipol Group. The project has transformed an unfinished structure into a modern office building, a symbol of urban regeneration and architectural innovation.

As with all systems installed in structures of considerable height, the systems were distributed from the bottom upwards and, as there was not enough space available inside the vertical shafts, Cefla opted for a solution featuring sub-central units located on each level of the tower.


Challenges

  • Renovation of an unfinished
    building Transforming a building that has been incomplete for 15 years into a modern and functional structure.
  • Integration of advanced systems Implementing cutting-edge plant engineering technologies in a complex architectural context.
  • Environmental sustainability Achieving high standards of energy efficiency and reduced environmental impact.

Intervention

Cefla was responsible for:

  • The design and construction of the air conditioning, plumbing, electrical and special systems.
  • The installation of geothermal and photovoltaic systems for the production of renewable energy.
  • The integration of a Building Management System (BMS) for the efficient management of the systems.

Realisation

The complex is divided into two V-shaped buildings: the lower one
is dedicated to recreational rooms and offices, while the upper one has 13 floors above ground and houses offices with a total capacity of almost 1,300 people.
Architecturally, the structure stands out for its façade made of special prismatic glass panels with a unique lighting effect and titanium dioxide stoneware cladding, which is capable of “neutralising” certain pollutants in the air.
The electrical, mechanical and hydraulic systems installed by Cefla stand out for their various innovative features designed to ensure maximum energy efficiency. With this in mind, a solution was chosen that does not use boilers but heat pumps with a system architecture already adopted for other networks in the district, which use groundwater from special intake and discharge wells. Through heat pumps, integrated with dry coolers and located on the roof together with the large photovoltaic system, the temperature of the groundwater is used for the condensation of the refrigeration units, the technological heart that guarantees heating in the cold months and cooling during the summer months.
Another key point of the redevelopment is the use of a BMS network, which manages all the building's “vital” systems, including, for example, those dedicated to environmental control of units, fire prevention, safety and access control. In addition to defining the highly futuristic character of the building, the BMS, which can of course be managed remotely, represents a considerable advantage in the event of corrective adjustments, maintenance and modifications, even from a control centre, and more generally during maintenance, which Cefla will provide for the entire complex for the first two years.
The management of the project, the construction site and, more generally, the engineering was entrusted to BIM, a three-dimensional model that offers complete integration between all areas of the building's design, allowing the entire process to reap the benefits of the digital world.
 In particular, the use of this model offered advantages in terms of efficiency and productivity, which are particularly important for maintenance and future implementations. In general, the ability to operate with maximum efficiency in the various design and operational components was one of Cefla's most recognised strengths and a key factor in the success of the project.



Case Study

Show all
La Casa di Leonardo
EPC Contracting

La Casa di Leonardo

Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
EPC Contracting

Torre Unipol, EPC Contracting

Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
EPC Contracting

Torre Allianz, EPC Contracting

Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
EPC Contracting

Galleria degli Uffizi

Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
EPC Contracting

Teatro alla Scala

Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
EPC Contracting

Cefla Gest

Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
EPC Contracting

Bassi Business Park

Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
EPC Contracting

FICO Eataly World

Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
EPC Contracting

Poste Italiane

Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...

Find the perfect solution for your business

 

Prefooter background
We create. You live