Poste Italiane
Construction of the Poste Italiane data centre at its headquarters
Poste Italiane's new data centre has been designed to meet Level IV TIER certification, according to the UpTime Institute.
Strength
Use of rotary UPS with integrated diesel:
Uninterruptible power supplies used in strategic areas because they ensure absolute continuity of operation of all devices in the event of even very brief interruptions in the power supply.
Key Numbers
6.000 kvar
Installed electrical power
3.200 kW
Installed cooling capacity
5.500 sqm
Area of intervention
Background
The complexity of the project, in addition to the size of the systems, was mainly due to the type of building, which dates back to the 1970s. Among other things, it was also necessary to adapt some areas of the building that were previously used as a garage and for other purposes.
The Data Centre was built with the aim of consolidating all of Poste Italiane's data processing centres scattered across various locations throughout the country.
Challenges
Project Tasks
Implementation
Complete construction of the new centralised data centre for Poste Italiane:
- diesel fuel tanks and generator sets with associated smoke extraction systems were installed on the third basement level.
- Data centre and electrical room area with new internal layout; system chimney up to the 13th floor;
- new cooling plant on the second basement level, with dry coolers located on the 13th floor.
Download
Gallery
Tutte le foto (4)
Case Study
EPC Contracting
Tema Sinergie
CEFLA hat den Ausbau des Hauptsitzes von Tema Sinergie in Faenza durchgeführt und dabei die...
EPC Contracting
Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...
EPC Contracting
M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...
EPC Contracting
Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...
EPC Contracting
City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...
EPC Contracting
Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...
EPC Contracting
Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...
EPC Contracting
TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...
EPC Contracting
Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...
EPC Contracting
Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...
News
Invitation to AgriBiogas 2026
13 May 2026
Cefla presents innovations in biogas during the "AgriBiogas 2026" event.
Cefla Receives DNV's ESG Recognition: Sustainability Certified.
29 April 2026
Cefla achieves ESG Recognition from DNV, confirming its commitment to sustainability and transparency in the environmental, social and governance spheres.
Cefla and Acea: Working Together to Shape the Future of Energy and the Environment
31 March 2026
Cefla and Acea collaborate to promote safety, sustainability and innovation in the energy sector.
Find the perfect solution for your business