Poste Italiane
Construction of the Poste Italiane data centre at its headquarters
Poste Italiane's new data centre has been designed to meet Level IV TIER certification, according to the UpTime Institute.
Strength
Use of rotary UPS with integrated diesel:
Uninterruptible power supplies used in strategic areas because they ensure absolute continuity of operation of all devices in the event of even very brief interruptions in the power supply.
Key Numbers
6.000 kvar
Installed electrical power
3.200 kW
Installed cooling capacity
5.500 sqm
Area of intervention
Background
The complexity of the project, in addition to the size of the systems, was mainly due to the type of building, which dates back to the 1970s. Among other things, it was also necessary to adapt some areas of the building that were previously used as a garage and for other purposes.
The Data Centre was built with the aim of consolidating all of Poste Italiane's data processing centres scattered across various locations throughout the country.
Challenges
Project Tasks
Implementation
Complete construction of the new centralised data centre for Poste Italiane:
- diesel fuel tanks and generator sets with associated smoke extraction systems were installed on the third basement level.
- Data centre and electrical room area with new internal layout; system chimney up to the 13th floor;
- new cooling plant on the second basement level, with dry coolers located on the 13th floor.
Download
Gallery
Tutte le foto (4)
Case Study

Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...

Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...

Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...

TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business