Allianz Tower
EPC Contracting for Allianz Tower
Cefla was responsible for the construction of the mechanical systems serving an office building, slab floor and underground car park, developed on the basis of a general sustainability strategy.
Strengths
Integral role in the project
Cefla acted as the EPC Contractor for all the technological systems in the skyscraper, providing a high-performance turnkey service.
High energy efficiency
The plant engineering solutions implemented have been designed to optimise efficiency and contribute to the tower's LEED Platinum certification.
Reliability and operational continuity
The systems have been designed to ensure maximum reliability over the long term, supporting a complex building with high occupancy density.
Key Numbers
205 m
Building height
50
Number of floors
beyond
50.000 m²
managed floor space
LEED Platinum
Environmental certification
Background
The Allianz Tower, located in Milan's CityLife district, is one of the most ambitious architectural and engineering projects completed in Italy in the last decade. It houses the Italian headquarters of Allianz S.p.A. and is considered a symbol of innovation and environmental sustainability.
Cefla's integrated approach ensured perfect coordination between design, material supply, installation and commissioning. The tower is now a model of energy efficiency and technological innovation.
Challenges
- Vertical installations
The tower's unique height required a detailed study of the plant engineering solutions, with particular attention to the vertical distribution of all systems. - Optimisation of technical spaces
Maximum efficiency was also achieved in the design of the spaces allocated to the systems, so as not to interfere with the use of office space. - High quality standards
All systems had to meet stringent requirements for LEED certification and environmental comfort.
Project Tasks
Cefla designed and built:
- Air conditioning and ventilation systems (HVAC)
- Plumbing and sanitary systems
- Electrical and special systems
- Automation and control systems
It also managed commissioning and functional testing, ensuring compliance with contractual deadlines and performance.
Realisation
The mechanical systems of the tower include:
- air conditioning systems
- plumbing systems
- fire prevention systems
- automatic mechanical system control.
The building complex is equipped with a number of “private” communal services, located and distributed within the slab floor area. The following mechanical systems were installed here:
- air conditioning and forced ventilation systems for the garages
- plumbing and drainage systems
- fire-fighting systems
- automatic control of mechanical systems.
The parking area is equipped with a natural ventilation system and a mechanical extraction system, supplemented by a ventilation system, which ensure effective air exchange. Two separate collection networks have been built in the Piastra area:
- Sewage network (toilets)
- Rainwater drainage network (rainwater and rain areas)
Download
Gallery
Tutte le foto (3)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
Notizie

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business