Unicredit Milan Porta Nuova
EPC Contracting for the Milan Porta Nuova Business Centre
The project was developed according to a general sustainability strategy that addresses six main issues: location, materials, water, energy, air and environmental quality.
Strengths
Engineering excellence
Cefla designed and built advanced technological systems for the three towers (A, B, C) and the Podium, ensuring high standards of energy efficiency and environmental comfort.
Environmental sustainability
The adoption of innovative plant engineering solutions has contributed to significantly reducing energy consumption, in line with the project's sustainability objectives.
Architectural integration
The systems have been harmoniously integrated into the architecture of the buildings, preserving the aesthetics and functionality of the spaces.
Key Numbers
140.000 m2
Total surface area
231 m
tower height
3
Number of towers
Background
The project is part of a wider urban redevelopment programme in Milan's Porta Nuova district, aimed at transforming the area into a modern business and residential centre. Previously characterised by brownfield sites, the area has undergone extensive urban and architectural redevelopment.
It is the largest urban redevelopment project ever undertaken in the centre of Milan and represents a unique model of sustainable development in Italy and Europe.
The project is the largest urban redevelopment project ever undertaken in the centre of Milan and represents a unique model of sustainable development in Italy and Europe.
Challenges
- Complex coordination
The simultaneous management of multiple buildings with different uses required careful planning and coordination between the various operational teams. - Technological integration
The implementation of advanced plant systems in high-rise buildings posed significant technical challenges, which were overcome thanks to Cefla Engineering's experience and innovation.
Project Tasks
Cefla oversaw the design and construction of the technological systems, including:
- Air conditioning and ventilation systems
- Electrical and lighting systems
- Plumbing and sanitary systems
- Automation and control systems
The project ensured high standards of energy efficiency and comfort for users.
Implementation
The plant engineering solutions concern:
storage, pumping and primary distribution systems for fire-fighting water lines;
water pumping and primary distribution systems; condensation systems for building air conditioning systems;
- control rooms for Towers A-B-C and the Podium;
- installation of a generator set per building to power general systems, and an additional 4 common generator sets to power more sensitive systems;
- air conditioning and forced ventilation systems for garages;
- plumbing systems (a “variable” volume system is used to ensure minimum pumping costs and minimum energy consumption);
- fire prevention systems;
- automatic regulation of mechanical and lighting systems;
- special electrical safety systems.
Download
Gallery
Tutte le foto (4)
Case Study
EPC Contracting
Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...
EPC Contracting
M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...
EPC Contracting
Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...
EPC Contracting
City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...
EPC Contracting
Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...
EPC Contracting
Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...
EPC Contracting
TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...
EPC Contracting
Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...
EPC Contracting
Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...
EPC Contracting
FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
Notizie
Cefla to Ecomondo 2025
29 October 2025
Once again this year Cefla is participating in Ecomondo, the international benchmark for ecological transition and circular economy.
Industrial competitiveness and energy transition
08 October 2025
Working table on "The role of cogeneration and biomethane for the country system."
Accadueo 2025
06 October 2025
Cefla is participating in ACCADUEO, Italy's first and only international trade fair dedicated exclusively to the civil and industrial water sector.
Find the perfect solution for your business