The Unifimm Tower is one of the first ten buildings in Italy to have obtained the ‘gold’ level of international LEED certification, which assesses the entire construction process from an energy and environmental impact perspective.
Strengths
Turnkey solution
Cefla supplied a turnkey solution, delivering the entire project from the project design to the technological system implementation phases.
High energy efficiency
The systems have been designed to ensure high efficiency, contributing to the building's environmental sustainability.
Integration with existing architecture
The designers' special focus was on system integration with the tower architecture, preserving the space aesthetics and functionality.
Key Numbers
127 m
Building height
33 floors
LEED Gold
Energy certification
Background
Torre Unifimm, also known as Torre Unipol, is 127 metres high and is the tallest building in the Emilia-Romagna region. The tower houses the offices of the Unipol financial group and a museum space. The project involved the redevelopment of a former industrial area, with the construction of a complex that also includes a hotel, a fitness centre, a car park and a shopping centre.
Cefla designed and built all the mechanical, electrical and special electrical systems for the entire area.
Challenges
- Integration with the architecture
Designing technological systems that integrate perfectly with the architecture of the tower, preserving the aesthetics and functionality of the spaces. - High energy efficiency standards
Ensuring plant solutions that meet the highest standards of energy efficiency and environmental sustainability.
- Tight deadlines
Completing the work in a short time, coordinating with other construction site activities.
Project Tasks
Cefla provided a turnkey solution that included:
- Mechanical, electrical and special systems designed to ensure high energy efficiency and environmental comfort.
- Automation and control systems for optimal plant management.
- Innovative solutions for reducing energy consumption and emissions.
Implementation
The project was successfully completed in 2011, on schedule and within budget.
Main features of the office tower:
- Use of clear neutral glass that does not distort colour perception;
- Use of protected and adjustable sunshades in the cavity for total light control;
- Use of construction technology that ensures greater fire safety by horizontally sectioning the various floors;
- Use of renewable energy sources;
- Data network system for each individual office and Wi-Fi and GSM coverage in all areas of the tower building, including the basement floors;
- Building facades illumination obtained with a colour-changing LED system.
Download
Gallery
Tutte le foto (3)
Case Study

La Casa di Leonardo
Cefla ha completato il data center 'La Casa di Leonardo' a Bologna, ottenendo certificazioni di...

Torre Unipol, EPC Contracting
Cefla ha trasformato Torre Unipol a Milano con soluzioni tecnologiche avanzate, sostenibilità e un...

Torre Allianz, EPC Contracting
Scopri come Cefla ha realizzato gli impianti meccanici della Torre Allianz a Milano, garantendo...

Galleria degli Uffizi
Cefla ha modernizzato gli impianti delle Gallerie degli Uffizi, garantendo efficienza energetica e...

Teatro alla Scala
Restauro impianti Teatro alla Scala: integrazione invisibile, sicurezza, efficienza energetica e...

Cefla Gest
Scopri come Cefla GEST ottimizza la gestione e manutenzione degli impianti industriali, garantendo...

Bassi Business Park
Riqualificazione sostenibile e tecnologica del Bassi Business Park a Milano, con focus su...

FICO Eataly World
Scopri come Cefla ha contribuito alla realizzazione di FICO Eataly World con soluzioni...

Poste Italiane
Realizzazione del data center centralizzato di Poste Italiane, con certificazione TIER IV e...

Unipol SAI De Castillia 23
Scopri come Cefla ha trasformato De Castillia 23 a Milano in un moderno ed efficiente edificio per...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business