Tema Sinergie
Cefla has completed the expansion of the Tema Sinergie headquarters.
Cefla acted as general contractor for the expansion of the Tema Sinergie headquarters, managing the detailed design and construction of the entire project. This complex project, completed in record time, integrates production spaces, offices, and reception areas into a single architectural structure.
Strengths
Complete integration of executive design, construction, and systems engineering, with multidisciplinary coordination.
Operational continuity guaranteed throughout all phases of intervention for the rest of the headquarters.
Operational continuity ensured for the rest of the headquarters throughout all intervention phases.
Architecture and technology at the service of corporate identity, with high-profile functional and representative spaces.
Key Numbers
Electrical power installed in MT cabin
1.000
kVA
Thermal power
640
kWt
Cooling capacity
860
kWf
Volume of treated air
13.000
m3/h
Background
For over forty years, Tema Sinergie has been operating in the health, wellness, and safety sectors, with an international positioning in nuclear medicine, theranostics, oncology radiotherapy, and pharmaceuticals.
The expansion of the Faenza headquarters responds to the company's growth and the need for adequate space for the development of production, management, and communication activities.
Challenges
-
A very tight schedule and a design change during construction.
-
The almost total lack of available operational space on the construction site.
-
The need to ensure continuity of operation of the existing headquarters during construction.
Project Tasks
Implementation
Cefla oversaw the building and plant engineering, from the structure to the roof, using prefabricated solutions and advanced technological systems to ensure efficiency, reliability, and safety. The external envelope is enhanced by perforated sheet metal sunshades, which characterize the complex's image, while the mechanical, electrical, and special systems ensure functionality and comfort in the workspaces.
Download
Gallery
+2
Tutte le foto (8)
Case Study
EPC Contracting
Tema Sinergie
CEFLA hat den Ausbau des Hauptsitzes von Tema Sinergie in Faenza durchgeführt und dabei die...
EPC Contracting
Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...
EPC Contracting
M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...
EPC Contracting
Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...
EPC Contracting
City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...
EPC Contracting
Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...
EPC Contracting
Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...
EPC Contracting
TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...
EPC Contracting
Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...
EPC Contracting
Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...
Notizie
Invitation to AgriBiogas 2026
13 May 2026
Cefla presents innovations in biogas during the "AgriBiogas 2026" event.
Cefla Receives DNV's ESG Recognition: Sustainability Certified.
29 April 2026
Cefla achieves ESG Recognition from DNV, confirming its commitment to sustainability and transparency in the environmental, social and governance spheres.
Cefla and Acea: Working Together to Shape the Future of Energy and the Environment
31 March 2026
Cefla and Acea collaborate to promote safety, sustainability and innovation in the energy sector.
Find the perfect solution for your business