FICO Eataly World

EPC Contracting for FICO Eataly World
Customer FICO Eataly World
Where Bologna
Solution EPC Contracting
Sector Retail

FICO Eataly World, which opened its doors in Bologna in 2017, is the world's largest theme park dedicated to Italian food and agriculture, its biodiversity, food culture and sustainability, and is considered the cultural heir to Expo Milano 2015.

Strengths

Turnkey solution

Cefla provided a complete solution, taking care of all stages of the project, from design to the installation of the technological systems.

High energy efficiency

The systems have been designed to ensure high efficiency, contributing to the environmental sustainability of the park.

Integration with existing architecture

Particular attention was paid to integrating the systems with the architecture of the complex, preserving the aesthetics and functionality of the spaces.


Key Numbers

About

10 hectares

Total surface area

6.000 kWe

Electrical power of the systems

6.000 kWt

Thermal power of the systems

Background

FICO Eataly World was a theme park dedicated to the agri-food sector and gastronomy, located in the Bologna Agri-Food Centre. Opened on 15 November 2017, the park covered an area of approximately 100,000 m² and included shops, restaurants, educational areas and outdoor spaces dedicated to agricultural activities.

The project implied a significant challenge in terms of the design and construction of the technological systems, given the complexity and variety of available functions within the park.


Challenges

  • Integration with the existing architecture
    Designing technological systems that integrate perfectly with the architecture of the complex, preserving the aesthetics and functionality of the spaces.
  • High energy efficiency standards
    Ensuring plant solutions that meet the highest standards of energy efficiency and environmental sustainability.
  • Tight deadlines
    Completing the work in a short time, coordinating with other construction site activities.

Project Tasks

Cefla oversaw the design and construction of the technological systems for FICO Eataly World, providing a turnkey solution that included:

  • Mechanical air conditioning, plumbing and industrial water systems.
  • Electrical systems for power and lighting.
  • Special systems, including security, fire prevention and building automation systems.

Implementation

The project was successfully completed in 2017, on schedule and within budget. The systems installed by Cefla have helped to ensure high standards of energy efficiency and environmental sustainability for FICO Eataly World.
In terms of electrical systems, it is worth noting the exclusive use of LED lighting and, above all, the production of electricity from the photovoltaic system (the largest on a roof in Europe), originally serving the operators now transferred to the NAM (Nuova Area Mercatale) and equipped with around forty delivery points (minimum 100 kW).
The rooms equipped with hoods have been fitted with systems for air extraction and recirculation or for air extraction only. The first type is used not only in closed laboratories but also in some shops and restaurants opening out to the mall. In addition to the hoods, there is an air extraction and replenishment system consisting of an extraction box with an inverter and a filtered and treated air replenishment unit. The air intake rate is equal to 80% of the extraction rate, so that the preparation rooms are at a lower pressure than the surrounding rooms. The air distribution and diffusion ducts are made of galvanised sheet metal. Replenishment is via adjustable finned supply grilles located near the hood. The air extraction systems are dedicated to the bars and small restaurants located in the mall and have modest extraction flow rates, counterbalanced by exhaust boxes with inverters.
Cefla has also been entrusted with the maintenance of the structure, which is carried out by qualified personnel on site using sophisticated real-time monitoring technologies.



Case Study

Show all
Tema Sinergie
EPC Contracting

Tema Sinergie

Cefla expands Tema Sinergie headquarters, blending advanced design and construction for enhanced...

Sea Linate Malpensa
EPC Contracting

Sea Linate Malpensa

CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

CĂ  Litta
EPC Contracting

CĂ  Litta

Technological redevelopment of CĂ  Litta in Milan: advanced solutions and respect for historical...

City of Cultures
EPC Contracting

City of Cultures

Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...

TeaPak
EPC Contracting

TeaPak

Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
EPC Contracting

Crif CED

Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
EPC Contracting

Le Cotoniere

Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

UNIFIMM Tower
EPC Contracting

UNIFIMM Tower

UNIFIMM Tower in Bologna achieves LEED Gold certification thanks to advanced plant solutions...

Galfa Tower
EPC Contracting

Galfa Tower

Revamping the Galfa Tower in Milan: architectural upgrading and energy sustainability with advanced...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Learn how Cefla transformed De Castillia 23 in Milan into a modern and efficient office building by...

Find the perfect solution for your business

4a2b25ccbf8b2e6563b6b139f2199771f55eed72
We create. You live