City of Cultures

EPC Contracting for City of Cultures
Customer City of Cultures
Where Milan
Solution EPC Contracting
Sector Artistic and Museum History

The City of Cultures in Milan is the most representative element of the entire redevelopment project for the former Ansaldo area, which is one of the landmarks of redevelopment projects for exhibition purposes.

Strengths

Architectural and plant integration

Cefla designed and built advanced technological systems that are perfectly integrated with the distinctive architecture of the complex, ensuring functionality and aesthetics.

Energy efficiency and sustainability

Implementation of high energy efficiency plant systems, contributing to the achievement of energy class A1.

Innovative technologies

Use of advanced systems for plant management and control, ensuring environmental comfort and optimisation of energy consumption.


Key Numbers

5.500 kW

Installed thermal power

5.265 kW

Installed cooling capacity

313.000 m3/h

Treated air

17.680 m2

Total area of intervention Lot A1 ‘Centre for Non-European Cultures’

Background

The project is the focal point of a new urban redevelopment strategy for abandoned areas, achieved in part by creating new spaces in order to return important historical areas to the city. The central area, once occupied by the Ansaldo warehouses in Via Bergognone, was transformed into the ‘City of Cultures’ in 1999. Due to the geographical location of the area in which it is located, flexible spaces have been created that can encourage new stimuli and be redefined over time.

A project characterised by a remarkable level of integration between architectural, structural and plant engineering aspects and innovative technologies for Italy.


Challenges

  • Plant integration
    Creating technological systems that integrate harmoniously with the architecture of the complex.
  • Multidisciplinary coordination
    Simultaneously managing different types of systems, ensuring a smooth interface between the various technological components.
  • Construction times
    Compliance with delivery schedules within the scope of a complex and structured effort.

Project Tasks

The complex comprises several spaces for various uses. Lot A of the overall project consists of two sections:

  • Lot A1: a new building located within the block and erected on the site of several demolished warehouses, intended to house the Centre for Non-European Cultures;
  • Lot A2: a new entrance building, also within the block, replacing an existing building. This building houses part of the facilities of Lot B, as well as the support facilities for the building.

Implementation

Cefla has created mechanical systems through continuous research, developing alternative solutions focused on primary objectives:

  • High-efficiency heating and cooling machines;
  • Use of groundwater as a heat exchanger;
  • Reliability and inspectability of machinery;
  • Technology to reduce operating costs.

These solutions have eliminated the need for conventional heating and cooling plants. The main atrium of the building acts as a climate buffer. Each plant has filtration systems and exchangers to separate groundwater from condensation water. Heat pumps use groundwater to produce hot and chilled water. In summer, groundwater dissipates condensation heat; in winter, it is a heat source. Air handling units filter, heat and humidify the air in winter, cool and dehumidify it in summer, with automatic control for energy savings.

 

 


Case Study

Show all
Tema Sinergie
EPC Contracting

Tema Sinergie

Cefla expands Tema Sinergie headquarters, blending advanced design and construction for enhanced...

Sea Linate Malpensa
EPC Contracting

Sea Linate Malpensa

CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...

Cà Litta
EPC Contracting

Cà Litta

Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...

TeaPak
EPC Contracting

TeaPak

Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...

Crif CED
EPC Contracting

Crif CED

Installation and certification of a state-of-the-art data center for CRIF, with architectural...

Le Cotoniere
EPC Contracting

Le Cotoniere

Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...

FICO Eataly World
EPC Contracting

FICO Eataly World

Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...

UNIFIMM Tower
EPC Contracting

UNIFIMM Tower

UNIFIMM Tower in Bologna achieves LEED Gold certification thanks to advanced plant solutions...

Galfa Tower
EPC Contracting

Galfa Tower

Revamping the Galfa Tower in Milan: architectural upgrading and energy sustainability with advanced...

Unipol SAI De Castillia 23
EPC Contracting

Unipol SAI De Castillia 23

Learn how Cefla transformed De Castillia 23 in Milan into a modern and efficient office building by...

Find the perfect solution for your business

4a2b25ccbf8b2e6563b6b139f2199771f55eed72
We create. You live