Kaleseramik has entrusted Cefla Impianti with upgrading the control and supervision system for the entire cogeneration plant at its two factories in Cannakale and Kalebodur, which make up the Can plant, as well as engineering for the installation of a new atomiser.
Strengths
Advanced digitisation
Cefla has implemented a state-of-the-art control and supervision system for the entire cogeneration plant, improving operational efficiency and energy management.
Multi-site integration
The new system enables centralised management of Kaleseramik's two factories, located in Çanakkale and Kalebodur, optimising operations and maintenance.
Reliability and safety
The upgrade has improved the operational safety and resilience of the plant, ensuring continuous and reliable energy production.
Key Numbers
2
Plants involved
22.500 kWe
Electrical power
Background
The partnership between Cefla and Kaleseramik began over 20 years ago with the construction of a cogeneration plant that enabled the company to significantly reduce its emissions and energy costs.
Challenges
- Technological modernisation
Upgrade of an existing control system to meet current efficiency and sustainability requirements. - Business continuity
Implementing the upgrade without disrupting daily production operations.
- Staff training
Ensuring that the internal team is adequately trained to use the new system effectively.
Project Tasks
Cefla designed and implemented a customised control and supervision system for Kaleseramik's cogeneration plant. The project included the installation of advanced hardware and software, integration with existing systems and staff training to ensure a smooth and efficient transition.
Implementation
The project was successfully completed, with an immediate positive impact on energy efficiency and operational management at Kaleseramik's plants. The upgrade has helped strengthen the company's position as a leader in the ceramics industry, highlighting the importance of technological innovation in industrial production.
The project involved the installation of a new atomiser with a water evaporation capacity of 25,000 litres per hour, connected to the existing cogeneration system and an additional system to recover heat from the kilns in order to maximise the use of existing thermal energy.
Cefla was responsible for the design and manufacture of the main mechanical components, instrumentation and components for the heat recovery system, as well as the supply of automation and supervision control devices (software and hardware). The advanced automation system allows one or more turbines to be used depending on the electrical energy required by the plants. Three Siemens gas turbines, with a total power of 21 MW, feed nine atomizers through their exhausts and supply electricity to all the plants. A fibre optic network transfers the control signal for all units at high speed, while the new software ensures monitoring of the entire system through an intuitive user interface, constant recording and reporting of functional data.
Download
Gallery
Tutte le foto (2)
Case Study

Pizzoli
Progetto innovativo di Cefla e Pizzoli: un Energy Hub sostenibile per ottimizzare consumo...

NOVA by Cefla a Imola
Prima installazione europea di cogenerazione a fuel cell da Cefla a Imola: alta efficienza...

A2A
Scopri come CEFLA ha realizzato una centrale di riserva avanzata a Cassano d'Adda, garantendo...

Tecnoparco Valbasento
Revamping energetico di Tecnoparco Valbasento: efficienza potenziata, sostenibilità e tecnologie...

Gold Art Ceramiche EnergieKer Group
Scopri come Cefla ha migliorato l'efficienza energetica e ridotto i costi di produzione nello...

Cottbus
Scopri la nuova centrale di teleriscaldamento a Cottbus: alta efficienza, riduzione delle emissioni...

Hera Centrale di Teleriscaldamento
Centrale di cogenerazione Hera a Bologna: efficienza energetica migliorata e riduzione delle...

Florim
Scopri come Cefla ha migliorato l'efficienza energetica dello stabilimento Florim di Mordano con un...

Kaleseramic
Aggiornamento innovativo dell'impianto di cogenerazione di Kaleseramik, migliorando l'efficienza...

SACA
Cefla ottimizza l'efficienza energetica e la sostenibilità ambientale di SACA con un sistema di...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business