The main purpose of the renovation was to create a representative office to accommodate the company's top management during their stay in Milan.
Strengths
Turnkey solution
Cefla carried out a complete refurbishment of the technological systems in the historic building, integrating modern solutions in keeping with the architectural context.
Implementation of intelligent control systems
The adoption of advanced technologies for plant management and monitoring has improved operational efficiency and environmental comfort.
Integrated EPC approach
Complete project management, from design to implementation, ensuring consistency and quality at every stage of the process.
Key Numbers
1.200 m²
target area
duration of the works
6
months
Total investment
1,5
million euros
Background
The building, which has seven floors above ground and three basement floors, features spacious executive offices and meeting rooms.
Challenges
- Integration into a historical setting
Implementing advanced technological solutions while being respectful of the architectural and historical characteristics of the building. - Structural limitations
Working in confined and restricted spaces, adapting the plant engineering solutions to the specific characteristics of the existing building. - Tight deadlines
Completing the work within a limited time frame, minimising the impact on the building's activities.
Project Tasks
Cefla has carried out:
- Replacement and upgrading of thermo-mechanical systems, improving energy efficiency and environmental comfort.
- Implementation of a Building Management System (BMS) for centralised control and monitoring of the systems.
- Installation of electrical and special systems, including safety and lighting systems, in compliance with current regulations.
Implementation
Completed in 2019, the project was delivered on schedule and ensured business continuity. Cefla's integrated approach effectively coordinated the various phases of the project, ensuring high standards of quality and performance.
CLIMATE CONTROL
On the roof of the offices, 12 external units of 45 kW and one of 56 kW power the internal units, providing heating and cooling. Two rooftop units treat 20,000 m³/h of outside air. In the lobby, floor panels support the internal units in winter. Via Pantano side (residential units): Floor panels air-condition the residential units, with towel warmers in the bathrooms. They also operate in summer with water at 18°C to prevent condensation and cool the air. A 7,000 m³/h rooftop unit and fan units with heat exchangers manage air exchange and humidity. The water for the panels and towel warmers is produced by a multi-purpose unit and distributed by pumps in an underground plant.
DOMESTIC HOT WATER PRODUCTION
Porta Romana side (Unipol offices): A direct expansion machine produces domestic hot water at 50°C. Via Pantano side (residential units): The multi-purpose unit produces domestic hot water at 50°C.
SMOKE DETECTION SYSTEM
The SIEMENS system, managed by two control units, monitors 500 detectors and 24 air analysis modules.
BMS SYSTEM
Two BMS systems manage the building, one for the offices and the other for the common areas of the residential units.
PHOTOVOLTAIC
Photovoltaic panels on the office roof produce almost 10KW.
FIRE PREVENTION
The access ramp and underground car parks are protected by a sprinkler system, with UNI45 fire extinguishers and hydrants throughout the building.
Download
Gallery
+3
Tutte le foto (9)
Case Study
EPC Contracting
Sea Linate Malpensa
CEFLA enhances Milan's Linate and Malpensa airports with advanced plant engineering, ensuring...
EPC Contracting
M9 Museum of the Twentieth Century
The M9 Museum in Mestre: an example of urban regeneration and energy sustainability thanks to...
EPC Contracting
Cà Litta
Technological redevelopment of Cà Litta in Milan: advanced solutions and respect for historical...
EPC Contracting
City of Cultures
Cefla has integrated advanced technologies and sustainable energy systems into Milan's City of...
EPC Contracting
Rome Metro
Redevelopment of the Termini junction in Rome: Cefla improves safety, efficiency and accessibility...
EPC Contracting
Unipol Midi
Learn about the construction of the Unipol Midi complex in Bologna: integrated design, energy...
EPC Contracting
TeaPak
Cefla builds a new production plant for TeaPak in Imola, completed during the pandemic, with...
EPC Contracting
Crif CED
Installation and certification of a state-of-the-art data center for CRIF, with architectural...
EPC Contracting
Le Cotoniere
Learn how Cefla integrated advanced systems into Salerno's Le Cotoniere Shopping Center, improving...
EPC Contracting
FICO Eataly World
Learn how Cefla contributed to FICO Eataly World with sustainable and energy-efficient plant...
News
Cefla to Ecomondo 2025
29 October 2025
Once again this year Cefla is participating in Ecomondo, the international benchmark for ecological transition and circular economy.
Industrial competitiveness and energy transition
08 October 2025
Working table on "The role of cogeneration and biomethane for the country system."
Accadueo 2025
06 October 2025
Cefla is participating in ACCADUEO, Italy's first and only international trade fair dedicated exclusively to the civil and industrial water sector.
Find the perfect solution for your business