Tecnoparco Valbasento
Power Generation for Tecnoparco Valbasento
Cefla dismantled the existing plant and built a new production site, partially reusing the original building.
Strengths
Enhanced efficiency
Replacement of four engines with three new high-efficiency Wartsila engines, each with a power output of 7.8 MW and an electrical efficiency of 48.9%.
Advanced energy recovery system
Heat recovery via 3 superheated steam generators powered by exhaust fumes.
Environmental sustainability
Installation of SCR (Selective Catalytic Reduction) system for emission reduction.
Key Numbers
23,4 MW
Total electrical power
3.000 t/h
Boiler capacity
2.335 kW
Thermal capacity of towers
Background
With this project, Cefla once again demonstrates its ongoing commitment to the development and implementation of technologically advanced solutions dedicated to energy efficiency.
Challenges
- Dismantling and reconstruction
The project involved dismantling the entire existing plant and integrating some pre-existing structures into the new layout. - Energy optimisation
Increasing the power and efficiency of the plant without expanding its footprint.
- Emissions control
Ensuring compliance with environmental regulations through advanced abatement technologies.
Project Tasks
Cefla carried out:
- Dismantling of the previous plant
- Installation of 3 Wartsila 16V34 SG engines, each with a power output of 7.8 MW
- Installation of 3 superheated steam generators powered by exhaust fumes
- Recovery of the existing plant manifold
- Installation of BALTIMORE evaporative towers
- SCR system for emission abatement
- Complete design by Cefla
Implementation
The project has consolidated the energy efficiency and sustainability of the Tecnoparco Valbasento industrial hub, guaranteeing electricity and steam to numerous companies in the district.
The flexibility and power of the new plant allow for optimised management of energy resources, in full compliance with environmental objectives.
Download
Gallery
Tutte le foto (6)
Case Study

Acea Tor di Valle
Renovation of the Tor di Valle district heating plant to improve energy efficiency and...

Nupi Industrie Italiane
Cefla's innovative trigeneration solution for Nupi Industrie Italiane in Busto Arsizio, optimizes...

A2A
Learn how CEFLA built an advanced reserve power plant in Cassano d'Adda, ensuring reliable and...

Nuova Riwal Ceramiche
High-efficiency cogeneration plant installed by Cefla for Nuova Riwal Ceramiche, improving...

Olivieri Carni
Olivieri Carni chose Cefla for a trigeneration plant, improving energy efficiency and reducing CO₂...

Effeffe Pet Food
Cefla's high-efficiency cogeneration plant for Effeffe Pet Food: reducing energy costs and...

Florim
Learn how Cefla improved energy efficiency at Florim's Mordano plant with a new 8,300 kWe...

Hera Central District Heating Plant
Hera cogeneration power plant in Bologna: improved energy efficiency and reduced CO₂ emissions...

Kaleseramic
Innovative upgrade of Kaleseramik's cogeneration plant, improving energy efficiency and...

SACA
Cefla optimizes SACA's energy efficiency and environmental sustainability with a natural gas...
Notizie

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business