A2A Power Generation
Central capacity market, Cassano d'Adda (MI)
A2A has appointed CEFLA to build a power plant equipped with internal combustion engines, designed exclusively to cover peak electricity demand, which uses cutting-edge technologies to reduce emissions.
Strengths
Strategic project for the national electricity grid:
plant designed to provide reserve power to cover peaks in demand that cannot be met by intermittent renewable sources.
Modularity and quick start-up:
plant with 6 high-efficiency internal combustion engines with a total capacity of 110.6 MWe, designed to be up and running quickly.
Low emissions and high efficiency:
use of natural gas (the fossil fuel with the lowest impact) and abatement technologies such as the SCR system.
Key Numbers
110,6 MWe
Total electrical power
6 for 18,43 MWe each
Number of motors
Background
The new plant was designed and built by CEFLA in a temporary consortium with Wärtsilä, a global leader in innovative technologies and life cycle solutions for the marine and energy markets.
Challenges
- Complex operating environment
Installation in a partially disused industrial area, requiring the redevelopment of existing structures and the integration of new systems.
- Integration with the national high-voltage grid
Design and construction of the 220 kV high-voltage connection, the most technically challenging part of the project.
- Flexibility and reliability
Ensuring rapid engine start-up to meet the needs of the national electricity system in a very short time.
Project Tasks
Cefla was responsible for:
- the design, procurement and construction (EPC) of the entire plant;
- the electrical and mechanical service and interconnection systems;
- the civil works, in collaboration with trusted partners;
- the management of the temporary association of companies with Wärtsilä, supplier of the engines and SCR systems.
The following facilities were maintained and adapted: the control room, the existing substation, the gas delivery station, part of the process and fire-fighting networks.
Implementation
The new plant, one of the largest and most advanced in Italy for reserve power generation, ensures energy is ready for the grid on demand, strengthening national security and resilience. Built in a brownfield site, it consists of two soundproof modular buildings, each housing three Wärtsilä 50SG simple cycle internal combustion engines with SCR systems and tower chimneys (40 m). Several existing infrastructures have been adapted or reused, such as the control room, electrical substation and methane measurement plant; unsuitable networks and structures have been demolished or relocated.
The six engines (18.43 MWe each) form a new unit with a single 220 kV feed point on the high-voltage side of the step-up transformer, integrated with control, protection and MV switchboards, connected to the 6 kV busbar via a 15/6.3 kV oil-filled transformer. The auxiliary services are powered by dedicated transformers on the MV switchboard.
The plant is completed by two uninterruptible power supply systems (UPS and rectifier) for priority users and an emergency generator. New reduction lines for motor power supply have been installed near the methane station. The auxiliary systems are cooled by a new closed air circuit with air coolers located on the roof.
Download
Gallery
Tutte le foto (4)
Case Study

Pizzoli
Progetto innovativo di Cefla e Pizzoli: un Energy Hub sostenibile per ottimizzare consumo...

NOVA by Cefla a Imola
Prima installazione europea di cogenerazione a fuel cell da Cefla a Imola: alta efficienza...

A2A
Scopri come CEFLA ha realizzato una centrale di riserva avanzata a Cassano d'Adda, garantendo...

Tecnoparco Valbasento
Revamping energetico di Tecnoparco Valbasento: efficienza potenziata, sostenibilità e tecnologie...

Gold Art Ceramiche EnergieKer Group
Scopri come Cefla ha migliorato l'efficienza energetica e ridotto i costi di produzione nello...

Cottbus
Scopri la nuova centrale di teleriscaldamento a Cottbus: alta efficienza, riduzione delle emissioni...

Hera Centrale di Teleriscaldamento
Centrale di cogenerazione Hera a Bologna: efficienza energetica migliorata e riduzione delle...

Florim
Scopri come Cefla ha migliorato l'efficienza energetica dello stabilimento Florim di Mordano con un...

Kaleseramic
Aggiornamento innovativo dell'impianto di cogenerazione di Kaleseramik, migliorando l'efficienza...

SACA
Cefla ottimizza l'efficienza energetica e la sostenibilità ambientale di SACA con un sistema di...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business