A2A Power Generation
Central capacity market, Cassano d'Adda (MI)
A2A has appointed CEFLA to build a power plant equipped with internal combustion engines, designed exclusively to cover peak electricity demand, which uses cutting-edge technologies to reduce emissions.
Strengths
Strategic project for the national electricity grid:
plant designed to provide reserve power to cover peaks in demand that cannot be met by intermittent renewable sources.
Modularity and quick start-up:
plant with 6 high-efficiency internal combustion engines with a total capacity of 110.6 MWe, designed to be up and running quickly.
Low emissions and high efficiency:
use of natural gas (the fossil fuel with the lowest impact) and abatement technologies such as the SCR system.
Key Numbers
110,6 MWe
Total electrical power
6 for 18,43 MWe each
Number of motors
Background
The new plant was designed and built by CEFLA in a temporary consortium with Wärtsilä, a global leader in innovative technologies and life cycle solutions for the marine and energy markets.
Challenges
- Complex operating environment
Installation in a partially disused industrial area, requiring the redevelopment of existing structures and the integration of new systems.
- Integration with the national high-voltage grid
Design and construction of the 220 kV high-voltage connection, the most technically challenging part of the project.
- Flexibility and reliability
Ensuring rapid engine start-up to meet the needs of the national electricity system in a very short time.
Project Tasks
Cefla was responsible for:
- the design, procurement and construction (EPC) of the entire plant;
- the electrical and mechanical service and interconnection systems;
- the civil works, in collaboration with trusted partners;
- the management of the temporary association of companies with Wärtsilä, supplier of the engines and SCR systems.
The following facilities were maintained and adapted: the control room, the existing substation, the gas delivery station, part of the process and fire-fighting networks.
Implementation
The new plant, one of the largest and most advanced in Italy for reserve power generation, ensures energy is ready for the grid on demand, strengthening national security and resilience. Built in a brownfield site, it consists of two soundproof modular buildings, each housing three Wärtsilä 50SG simple cycle internal combustion engines with SCR systems and tower chimneys (40 m). Several existing infrastructures have been adapted or reused, such as the control room, electrical substation and methane measurement plant; unsuitable networks and structures have been demolished or relocated.
The six engines (18.43 MWe each) form a new unit with a single 220 kV feed point on the high-voltage side of the step-up transformer, integrated with control, protection and MV switchboards, connected to the 6 kV busbar via a 15/6.3 kV oil-filled transformer. The auxiliary services are powered by dedicated transformers on the MV switchboard.
The plant is completed by two uninterruptible power supply systems (UPS and rectifier) for priority users and an emergency generator. New reduction lines for motor power supply have been installed near the methane station. The auxiliary systems are cooled by a new closed air circuit with air coolers located on the roof.
Download
Gallery
Tutte le foto (4)
Case Study
Power Generation
Acea Tor di Valle
Renovation of the Tor di Valle district heating plant to improve energy efficiency and...
Power Generation
Nupi Industrie Italiane
Cefla's innovative trigeneration solution for Nupi Industrie Italiane in Busto Arsizio, optimizes...
Power Generation
A2A
Learn how CEFLA built an advanced reserve power plant in Cassano d'Adda, ensuring reliable and...
Power Generation
Nuova Riwal Ceramiche
High-efficiency cogeneration plant installed by Cefla for Nuova Riwal Ceramiche, improving...
Power Generation
Olivieri Carni
Olivieri Carni chose Cefla for a trigeneration plant, improving energy efficiency and reducing CO₂...
Power Generation
Effeffe Pet Food
Cefla's high-efficiency cogeneration plant for Effeffe Pet Food: reducing energy costs and...
Power Generation
Florim
Learn how Cefla improved energy efficiency at Florim's Mordano plant with a new 8,300 kWe...
Power Generation
Hera Central District Heating Plant
Hera cogeneration power plant in Bologna: improved energy efficiency and reduced CO₂ emissions...
Power Generation
Kaleseramic
Innovative upgrade of Kaleseramik's cogeneration plant, improving energy efficiency and...
Power Generation
SACA
Cefla optimizes SACA's energy efficiency and environmental sustainability with a natural gas...
News
Cefla to Ecomondo 2025
29 October 2025
Once again this year Cefla is participating in Ecomondo, the international benchmark for ecological transition and circular economy.
Industrial competitiveness and energy transition
08 October 2025
Working table on "The role of cogeneration and biomethane for the country system."
Accadueo 2025
06 October 2025
Cefla is participating in ACCADUEO, Italy's first and only international trade fair dedicated exclusively to the civil and industrial water sector.
Find the perfect solution for your business