With the system built by Cefla, GIAS confirms its role as a company committed to finding concrete, proven solutions aimed at improving the sustainability and energy efficiency of its production process, with a consequent reduction in production costs.
Strengths
Turnkey solution
Cefla designed and built a complete trigeneration plant tailored to GIAS's production needs in the frozen food sector.
Energy efficiency
The plant enables the combined production of electricity, heat and cooling, optimising consumption and reducing emissions.
Integration with the production process
The system has been designed to directly power the plant's heating and cooling systems, improving overall efficiency.
Key Numbers
2.004 kW
Electrical power
1.050 kWt
Heat recovered from hot water
242 kW
Cooling capacity (ammonia at -40°C)
Background
GIAS is an Italian company specialising in the production of frozen foods. The Mongrassano Scalo (CS) plant is an important production facility in the food sector, with a focus on quality and innovation.
The plant is designed to be highly efficient, up to over 85% more than to natural gas plants, thanks to the electrical efficiency of the engine and the complete recovery of cogenerated thermal energy, which allows it to be classified as High Efficiency Cogeneration.
Challenges
- Integration with existing processes
Adapting the trigeneration plant to GIAS's specific production requirements, ensuring operational continuity. - Energy optimisation
Maximising plant efficiency to achieve the best results in terms of energy savings and emissions reduction.
Project Tasks
Cefla handled the design, supply and installation of the trigeneration plant, ensuring full integration with GIAS's existing infrastructure. The project included the implementation of advanced control systems to monitor and optimise plant performance.
Implementation
Cefla supported Gias from the energy analysis phase to the economic feasibility study, identifying the most suitable plant solution. The project involved the turnkey construction of a trigeneration plant consisting of a 2 MWe natural gas cogeneration module, an energy recovery system and an ammonia absorber for the production of cooling energy for the -40 °C freezing circuit. The plant, pre-assembled and soundproofed for outdoor installation, is integrated with the existing electrical and thermal network and all the necessary interfaces.
Cefla's design guarantees:
- Easy configuration
- Reliability and safety of components
- Easy maintenance and operational management
The project has improved the energy efficiency and reduced the environmental impact of the GIAS plant. Its sizing (2 MW electric, 242 kW refrigeration, hot water) allows for maximum efficiency and significant cost reductions. Cefla's proposal ensured:
- A system tailored to GIAS's needs
- Perfect integration between systems
- A single interface, including for after-sales, through a maintenance contract for comprehensive and continuous service.
Download
Gallery
Tutte le foto (4)
Case Studies

Pizzoli
Progetto innovativo di Cefla e Pizzoli: un Energy Hub sostenibile per ottimizzare consumo...

NOVA by Cefla a Imola
Prima installazione europea di cogenerazione a fuel cell da Cefla a Imola: alta efficienza...

A2A
Scopri come CEFLA ha realizzato una centrale di riserva avanzata a Cassano d'Adda, garantendo...

Tecnoparco Valbasento
Revamping energetico di Tecnoparco Valbasento: efficienza potenziata, sostenibilità e tecnologie...

Gold Art Ceramiche EnergieKer Group
Scopri come Cefla ha migliorato l'efficienza energetica e ridotto i costi di produzione nello...

Cottbus
Scopri la nuova centrale di teleriscaldamento a Cottbus: alta efficienza, riduzione delle emissioni...

Hera Centrale di Teleriscaldamento
Centrale di cogenerazione Hera a Bologna: efficienza energetica migliorata e riduzione delle...

Florim
Scopri come Cefla ha migliorato l'efficienza energetica dello stabilimento Florim di Mordano con un...

Kaleseramic
Aggiornamento innovativo dell'impianto di cogenerazione di Kaleseramik, migliorando l'efficienza...

SACA
Cefla ottimizza l'efficienza energetica e la sostenibilità ambientale di SACA con un sistema di...
News

Cefla participates in Agribiogas 2025
04 July 2025
AgriBiogas 2025 offers an agenda aimed at delving into the future of the biogas and biomethane system, between critical issues to be overcome and opportunities to be seized, untangling the PNRR and the Ecological Practices Decree.

Data Center Nation 2025
04 July 2025
On Wednesday, April 2, 2025, we will participate in Data Center Nation at the Allianz MiCo - Milano Convention Centre - one of the main reference events in Italy for the #Datacenter industry.

Key Energy 2025 Rimini
04 July 2025
We will be at KEY 2025, the benchmark event for energy transition. Discover our solutions for cogeneration, fuel cells and energy efficiency.
Find the perfect solution for your business